Countdown to Splashdown

Final lot of jobs are done, Rosie is ready to take to the water again. Last two things are putting batteries back and recomissioning the engine.

Once afloat I have some minor jobs that can be done as and when over the season:

  • Repaint non slip deck
  • Refit bow nav lights
  • Fit 60W solar system

There are a few other things I was thinking about, one of them being to Fit my Vetus waterlock. I’ve had it for over a year ready to fit but just never found the time.

Leave a comment